The 100% on-dock system and 22 rows and 7 tiers of the latest container cranes, which enable stevedoring of the mega carriers (10,000 TEU or more), perform a high average of 30moves per hour for maximum productivity. Advanced IT-aided operation of the terminal and the automated gate-in&-out service make Gwangyang Port for an optimal logistics system. In addition, Hyundai Merchant Marine Co., Hanjin Shipping, Maersk, CMA, APL, and other global shipping liners provide worldwide and feeder services.

 
Development status
Classification Overall plan In operation Plan
Phase 1 Phase 2 Phase 3-1 Phase 3-2 Future
Project period 1987 ~ 2020 1987 ~ 1997 1995 ~ 2004 1999 ~ 2006 2003 ~ 2011 ~ 2020
Berthing capacity 50,000 tons
¡¿ 29
50,000 tons
¡¿ 4
50,000 tons
¡¿ 4
50,000 tons
¡¿ 4
50,000 tons
¡¿ 3
50,000 tons
¡¿ 14
20,000 tons
¡¿ 5
- 20,000 tons
¡¿ 4
- 20,000 tons
¡¿ 1
-
Handling capacity
(TEU)
12.45 million 1.6 million 2.28 million 1.6 million 1.37 million 5.6 million
Quay length (m) 11,260 1,400 2,300 1,400 1,260 4,900
400,000 TEU for 50,000 tons-class berth and 170,000 TEU for 20,000 tons-class berth are used as the baseline cargo volumes to process
 
Operation status
Classification Total area
(§³)
Container yard(CY)
(§³)
CFS
(5,280§³)
Quay water depth
(m)
Container crane
(CC)
Storage capacity
(TEU)
TGS
(TEU)
Operator
Phase 1 840,000 500,000 4 building -16 18 rows ¡¿ 8
22 rows ¡¿ 2
52,000 14,184 GICT
(Sebang+ Hanjin Shipping)
Hutchinson Korea
Phase 2 1,066,000 580,000 3 building -16 18 rows ¡¿ 6
22 rows ¡¿ 6
71,000 16,914 Dongbu Express Korea International Terminal
Phase 3-1 840,000 627,000 1 building -16 22 rows ¡¿ 8   13,746 STX-Korea Express
TGS : Terminal Ground Slot
 
 
02" align="center">50,000 tons
¡¿ 3 50,000 tons
¡¿ 14 20,000 tons
¡¿ 5 - 20,000 tons
¡¿ 4 - 20,000 tons
¡¿ 1 - Handling capacity
(TEU) 12.45 million 1.6 million 2.28 million 1.6 million 1.37 million 5.6 million Quay length (m) 11,260 1,400 2,300 1,400 1,260 4,900 400,000 TEU for 50,000 tons-class berth and 170,000 TEU for 20,000 tons-class berth are used as the baseline cargo volumes to process   Operation status
Classification Total area
(§³)
Container yard(CY)
(§³)
CFS
(5,280§³)
Quay water depth
(m)
Container crane
(CC)
Storage capacity
(TEU)
TGS
(TEU)
Operator
Phase 1 840,000 500,000 4 building -16 18 rows ¡¿ 8
22 rows ¡¿ 2
52,000 14,184 GICT
(Sebang+ Hanjin Shipping)
Hutchinson Korea
Phase 2 1,066,000 580,000 3 building -16 18 rows ¡¿ 6
22 rows ¡¿ 6
71,000 16,914 Dongbu Express Korea International Terminal
Phase 3-1 840,000 627,000 1 building -16 22 rows ¡¿ 8   13,746 STX-Korea Express